SUBOR GRP Pipes are used in Dvirula Hydroelectrical Power Plant Project in Georgia
SUBOR GRP pipes were selected for the Dvirula HPP Project in Borjomi region of Georgia. SUBOR have been following this project for nearly 2 years. Total of 4.5 km long SUBOR GRP pipes with diameter range DN700-800 mm were supplied.